46.105 Contractor responsibilities.
-
(a) The contractor is responsible for carrying out its obligations under the contract by--
(1) Controlling the quality of supplies or services; -
(2) Tendering to the Government for acceptance only those supplies or services that conform to contract requirements; -
(3) Ensuring that vendors or suppliers of raw materials, parts, components, subassemblies, etc., have an acceptable quality control system; and -
(4) Maintaining substantiating evidence, when required by the contract, that the supplies or services conform to contract quality requirements, and furnishing such information to the Government as required.
-
-
(b) The contractor may be required to provide and maintain an inspection system or program for the control of quality that is acceptable to the Government (see 46.202). -
(c) The control of quality by the contractor may relate to, but is not limited to--
(1) Manufacturing processes, to ensure that the product is produced to, and meets, the contractâs technical requirements; -
(2) Drawings, specifications, and engineering changes, to ensure that manufacturing methods and operations meet the contractâs technical requirements; -
(3) Testing and examination, to ensure that practices and equipment provide the means for optimum evaluation of the characteristics subject to inspection; -
(4) Reliability and maintainability assessment (life, endurance, and continued readiness); -
(5) Fabrication and delivery of products, to ensure that only conforming products are tendered to the Government; -
(6) Technical documentation, including drawings, specifications, handbooks, manuals, and other technical publications; -
(7) Preservation, packaging, packing, and marking; and -
(8) Procedures and processes for services to ensure that services meet contract performance requirements.
-
-
(d) The contractor is responsible for performing all inspections and test required by the contract except those specifically reserved for performance by the Government (see 46.201(c)).