30.602 Materiality.
-
(a) In determining materiality, the CFAO shall use the criteria in48 CFR 9903.305 . -
(b) A CFAO determination of materiality--
(1) May be made before or after a general dollar magnitude proposal has been submitted, depending on the particular facts and circumstances; and -
(2) Shall be based on adequate documentation.
-
-
(c) When the CFAO determines the cost impact is immaterial, the CFAO shall--
(1) Make no contract adjustments and conclude the cost impact process; -
(2) Document the rationale for the determination; and -
(3) In the case of noncompliance issues, inform the contractor that--
(i) The noncompliance should be corrected; and -
(ii) If the noncompliance is not corrected, the Government reserves the right to make appropriate contract adjustments should the cost impact become material in the future.
-
-
-
(d) For required, unilateral, and desirable changes, and CAS noncompliances, when the amount involved is material, the CFAO shall follow the applicable provisions in 30.603, 30.604, 30.605, and 30.606.