52.236-4 Physical Data.
As prescribed in
Physical Data
Data and information furnished or referred to below is for the Contractorâs information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
-
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by __________ [insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probings, test tunnels]. -
(b) Weather conditions __________ [insert a summary of weather records and warnings]. -
(c) Transportation facilities _________ [insert a summary of transportation facilities providing access from the site, including information about their availability and limitations]. -
(d) ___________ [insert other pertinent information].
(End of clause)
Comments